Our Fence Installation Process (Start to Finish)
Here’s exactly what to expect with Clean Cut Fencing. We confirm your layout and style, set posts deep, keep lines straight, tune gates to swing smooth, and leave the jobsite tidy each day.
Step 1 — Request a free estimate
Send your address and a few photos for a virtual estimate, or book an in-person estimate. We confirm style, height, gates, and any HOA/city notes.
Step 2 — On-site walkthrough & quote
We verify measurements, fence line, slopes/obstacles, and gate placements. You get a clear written estimate and timeline.
Step 3 — Utilities & scheduling
We schedule the dig (and utility locate if needed), order materials, and lock the build date.
Step 4 — Build day(s): posts → panels → gates
-
Posts set deep in concrete and sized for height/wind
-
Panels aligned with tight spacing; clean step/rack on slopes
-
Gates framed and tuned so they swing true and latch cleanly
Step 5 — Final walkthrough, cleanup & care
We sweep up, haul debris, test gates with you, and share easy care tips. You’ll have our contact if anything needs attention.
FAQs
How long does installation take?
Most residential projects finish in 1–3 days once materials are on site.
Do you handle permits?
Where required, we guide you on local rules and timing.
_edited.jpg)